VERONA — The board of directors of the New York State Environmental Facilities Corp. (EFC) recently approved and announced almost $5.27 million in zero-interest financing to the town of Verona to construct a wastewater-collection system in one of its hamlets.
The town is extending municipal-sewer service to the hamlet of Verona in the southern portion of the town, where residential and commercial properties are served by private, onsite wastewater-treatment facilities. These failing and inadequate subsurface disposal systems will be replaced by a wastewater-collection system, main pump station, and force main that will flow by gravity to the City of Oneida’s Wastewater Treatment Plant. The plant is large enough to accept the flow from the proposed district, according to the EFC.
“Replacing failing septic systems with a modern collection system will improve the environment, protect public health and create economic development opportunities in and around the hamlet of Verona,” EFC President and CEO Matthew Driscoll, said in the release. Driscoll was previously mayor of Syracuse.
(Sponsored)
Timekeeping Trap: Be Careful When “Rounding” an Employee’s Work Time
The Fair Labor Standards Act (FLSA) regulations do not require an employer to track and pay an employee for the exact number of minutes they actually work. As currently written,
“Borderline” Overtime Exemptions Require Careful Analysis and Precautionary Measures
Q: We have an employee who we believe is properly classified as exempt from receiving overtime under the Fair Labor Standards Act (FLSA) but it is a “borderline” case. In