SYRACUSE, N.Y. — The New York State Department of Transportation (NYSDOT) will host an open house on Thursday, Sept. 26 from 6-8 p.m., discussing the fourth contract of the Interstate 81 (I-81) viaduct-replacement project.
The fourth contract focuses on construction on Interstate 690 (I-690), Crouse and Irving Avenues, and several streets on the east side in the city of Syracuse.
The informal, open-house-style meeting will be held at the Central New York Biotech Accelerator at Upstate Medical University, 841 E. Fayette St. in Syracuse.
(Sponsored)
10 Reasons Your Business Needs Cyber Insurance
1. Cyber crime is the fastest growing crime in the world, but most attacks are not covered by standard property or crime insurance policies. New crimes are emerging every day.
Sales Employees are Not Always Exempt from Overtime
Are you sure that your company’s sales staff are properly categorized as exempt from the overtime requirements of the Fair Labor Standards Act (FLSA)? The FLSA regulations make it
Project renderings will be available for review and NYSDOT representatives, along with the prime contractor, will also be available to answer questions. NYSDOT isn’t planning a formal presentation.
The CNY Biotech Accelerator is accessible to people with disabilities. Please contact TeNesha Murphy at (315) 728-4251 if a sign language interpreter, assisted-listening system, or other accommodation will be required to facilitate your participation in the open house.
Fourth contract details
Contract four of the I-81 viaduct-replacement project includes the realignment of I-690 to accommodate a new interchange from Crouse Avenue to I-690.
The contract will also reconstruct Crouse and Irving Avenues, reconfiguring both streets from two to three lanes; reconstruct and resurface portions of seven additional city streets; and replace two bridges on I-690 — over Lodi Street and Crouse Avenue — to align with the interstate.
Work within contract four also includes the start of major upgrades to the Syracuse and Onondaga County drainage systems, separating storm water and sanitary sewer flow, NYSDOT said. Additional contract elements include new traffic video detection signals; designated bike lanes; shared-use paths; new sidewalks and crosswalks with pedestrian poles; and the installation of noise barriers along I-690.